-
Medium (10,000$ - 100,000$)
-
0 proposals
-
14th August 2016
-
3269 days, 8 hours, 52 min
VISCOSIFIER: Bentonite API Natural Polymer Carboxy Methyl Cellulose High Viscosity Polyanionic Cellulose Regular Technical Grade WEIGHING AGENT: Barite API Ground lime stone DISPERSANT & DEFLOCCULANT Causticized Lignite Potassium Lignite Chro
-
Medium (10,000$ - 100,000$)
-
0 proposals
-
14th August 2016
-
3272 days, 13 hours, 30 min
Supplying
Roller bearing, Inch Tapered Roller Bearings, Metric Tapered Roller Bearing
-
Medium (10,000$ - 100,000$)
-
0 proposals
-
14th August 2016
-
3272 days, 13 hours, 30 min
Supplying
Regenerative Turbine Pumps Centrifugal Pumps Washdown 12 Volt Pump Centrifugal Pumps Sealless Pumps Immersible Pumps Sealless Canned Centrifugal Pumps DC Brushless Pumps
-
Medium (10,000$ - 100,000$)
-
0 proposals
-
14th August 2016
-
3272 days, 13 hours, 30 min
Supplying
Synthetic Oil Based system Diesel Oil based system Dispersed water based system Low pH Desco system KCl Polymer system Polymer glycol system Silicate system Non damaging drill in fluid system Potassium Sulphate Inhibitive system
-
Medium (10,000$ - 100,000$)
-
0 proposals
-
14th August 2016
-
3272 days, 13 hours, 30 min
Buying
Oil, gas, exploration, production, refining, storage
-
Medium (10,000$ - 100,000$)
-
0 proposals
-
14th August 2016
-
3272 days, 13 hours, 30 min
Supplying
blowout preventers, valves, ram blocks, spools, chokes, frac heads, sand separatos, manufacturing, replacement parts, drilling parts
-
Medium (10,000$ - 100,000$)
-
0 proposals
-
14th August 2016
-
3272 days, 13 hours, 30 min
Supplying
Blowout preventers, valves, Replacement parts
-
Medium (10,000$ - 100,000$)
-
0 proposals
-
14th August 2016
-
3272 days, 13 hours, 30 min
Supplying
mud pumps, centifrugal pumps, blowout preventers, turbine parts, Supplier for major U.S. Manufacturers, Replacement parts and spares for oilfield equipment
-
Medium (10,000$ - 100,000$)
-
0 proposals
-
14th August 2016
-
3272 days, 13 hours, 30 min
Supplying
drill bits, drilling software,coiled tubing, cementing, fluids, hole enlargement, fishing, mud logging, integrated project management, water treatment systems, well completions, production services, horizontal drilling, geothermal tech,
-
Medium (10,000$ - 100,000$)
-
0 proposals
-
14th August 2016
-
3272 days, 13 hours, 30 min
Supplying
drill bits, core bits, horizontal drill bits, manufacturing, carbide body, manufacturing